400 ton Crane Piling Barge
10 oktober 2016IHC S-500 & S-280 Hydr. Hammers
10 oktober 2016Jack-up Barge, 300 ton pedestal crane
ABS. L x W x Depth (m): 46.0 x 30.5 x 4.50. Max. operating depth 30 meter. 300 ton pedestal crane. 732 dwt. Asia-Pacific. For Charter only. Inquire
Artikelnummer: G0054
Categorieën: Barges (all types), Jack-up Barges, Self-elevating Platforms, Lift boats & Spud pontoons, Offshore Vessels
Tag: Charter only
General | |
Built | 2013 |
Class | ABS, ✠ A1 Construction and |
Maintenance Service, | |
Self-Elevating Unit | |
Pontoon | |
Length | 46.0 m |
Beam | 30.5 m |
Depth | 4.50 m |
Draft | 2.40 m |
Tank capacity | |
Fuel | 60 m³ |
Fresh water | 60 m³ |
Jacking system | |
System | Positive engagement |
Capacity (preload) | 1,300 ton/leg |
Jacking speed (ave.) | 10 m/hr |
Leg length (max / opt.) | 55 m / 65 m |
Water depth (max / opt.) | 30 m / 40 m |
Crane | |
Main hoist | 300 ton @ 18 meter |
Aux. hoist | 32 ton |
Mooring system | |
Winches | 4 x 60 t hold, 25 t pull |
Wires | 4 x 500 m x 32 mm |
Anchors | 4 x Delta Flipper; 3 ton |
Machinery | |
Main generators | 2 x 450 kVA |
Auxiliary generator | 1 x 120 kVA |
Pile testing facilities | |
Pile diameter (max) | 3.0 m |
Compression test (max) | 1,250 ton |
Tension test (max) | 900 ton |
Optional equipment | |
Impact hammers, Vibration hammers, Drill rigs | |
Accommodation | |
Main deck | deck store, first aid room, tea room, |
deck toilet, tween deck, mess room (24) | |
c/w kitchenette, wash/change room, toilet | |
Upper deck | double cabin, 3 x offices, meeting room, toilet |
Gerelateerde producten
-
Accommodation Work Barge (2 sisters)
Unrestricted operation. 8-point mooring. S-92 Helideck, 68 ton, 70m elevation, 12m reach service crane. Location: WAF. For Charter only. Inquire
-
60 tbp AHTS, DP-1, FiFi-1 waterspray
2004, BV, Loa 48.00 m, width 13.20 m, depth 5.20 m, draft 4.20 m. Deadweight +/- 860 tons. deck cargo: +/- 300 tons. Deck area 250 m2, accommodation 24 persons. ME Gulf Region Price: Inquire
-
360 pax Accommodation / Work Barge
Unrestricted operation. ABS/IRS class. SPS compliant. 8-point mooring. Helideck, 350 ton lattice boom crane. Location: Gulf region. For Charter only. Inquire
- Hook-up and commissioning
- Subsea Pipeline and Construction Support
- Deep diving support
- Post trenching
- Shallow water & deep water applications